Aksa Electrical Engineering

Evergreen Project – IIT Bombay

Project Overview

A prestigious hostel development inside the IIT Bombay campus, where AKSA executed complete electrical

In this project we are Responsible all Electrical work like

  • Educational infrastructure
  • Multi-service electrical package
  • High-quality workmanship
  • Timely project execution
“Proactively envisioned multimedia based expertise and cross-media growth
strategies. Seamlessly visualize quality intellectual capital without superior.”

- Al-Jamea

Scope of Work

Slab & open conduit
Point wiring
LT cable laying
Cable tray installation
Electrical panels
Data network
CCTV, WiFi
Fire alarm
Access control
Public address system
Earthing & lighting protection

Evergreen project - IIT Bombay

Electrical Contracting Work

Client Name

IITBAA

Category

Electrical

Construction Area

3.75 Lakh sq. ft.

Budget

7.80 cr

Location

Powai, Mumbai

Social Links

Completely synergize resource taxing.

Have a
project in
mind?

From concept to commissioning

AKSA Electrical Engineering follows a systematic execution process to ensure every project is delivered safely, efficiently, and in accordance with client requirements.

01
Step

Requirement Analysis

Our engineering team reviews client requirements, tender specifications, electrical drawings, site conditions, and project schedule.
02
Step

Engineering & Planning

Before execution begins, we prepare material planning, manpower planning, work schedule, risk assessment, and procurement plan.
03
Step

Procurement & Logistics

AKSA ensures approved materials, timely procurement, quality inspection, safe transportation, and organized site storage.
04
Step

Installation & Execution

Our experienced team executes HT & LT electrical works, internal electrification, electrical panels, ELV systems, lighting installation, earthing system, and cable laying & termination.
05
Step

Testing & Commissioning

Before project handover, we perform Insulation Resistance (IR) Testing, Earth Resistance Testing, Continuity Testing, Phase Sequence Testing, Functional Testing, and System Commissioning.
06
Step

Documentation & Handover

Final documentation includes test reports, inspection records, as-built drawings (where applicable), operation & maintenance documents, and client handover.