A landmark educational campus and one of AKSA's flagship projects, inaugurated by the Honorable Prime Minister of India. The project involved comprehensive electrical infrastructure and ELV system installation over a large campus.

In this project we are Responsible all Electrical work like

  • HT cable pulling and Termination
  • Armound cable pulling & Termination 6sqmm to 300sqmm cable.
  • DB Installation
  • Slab conducting,
  • Concealed Box fixing
  • Wiring
  • Switch socket installation
  • Light fixture Installation
  • Fan Installation.

We have also done work for ELV like

  • Cat6 for Data, WIFI, Camera, Access control & Telephone
  • PA cable pulling
  • Fire Alarm cable pulling.
  • Audio speaker cable pulling
  • Video speaker cable pulling.
  • Fiber optic cable
“Proactively envisioned multimedia based expertise and cross-media growth
strategies. Seamlessly visualize quality intellectual capital without superior.”

- Al-Jamea

Features of Project

Large-scale institutional project
Complete electrical and
ELV execution
Delivered with high safety
and quality standards
Executed by experienced
project teams

Al-Jamea Project

Electrical Contarcting Work

Client Name

The Saifee Foundation

Category

Electrical

Construction Area

6.72 Lakh sq. ft.

Budget

28 cr (with material)

Location

Marol Andheri Mumbai

Social Links

Completely synergize resource taxing.

Have a
project in
mind?

From concept to commissioning

AKSA Electrical Engineering follows a systematic execution process to ensure every project is delivered safely, efficiently, and in accordance with client requirements.

01
Step

Requirement Analysis

Our engineering team reviews client requirements, tender specifications, electrical drawings, site conditions, and project schedule.
02
Step

Engineering & Planning

Before execution begins, we prepare material planning, manpower planning, work schedule, risk assessment, and procurement plan.
03
Step

Procurement & Logistics

AKSA ensures approved materials, timely procurement, quality inspection, safe transportation, and organized site storage.
04
Step

Installation & Execution

Our experienced team executes HT & LT electrical works, internal electrification, electrical panels, ELV systems, lighting installation, earthing system, and cable laying & termination.
05
Step

Testing & Commissioning

Before project handover, we perform Insulation Resistance (IR) Testing, Earth Resistance Testing, Continuity Testing, Phase Sequence Testing, Functional Testing, and System Commissioning.
06
Step

Documentation & Handover

Final documentation includes test reports, inspection records, as-built drawings (where applicable), operation & maintenance documents, and client handover.